Skip to main navigation.
Report Outage: 1-800-927-6206

New Construction

Welcome to Riverland Energy Cooperative!

New Construction

We are eager to assist you in getting started with your new electric service. To get the process started, click on the links below and complete following forms:

Once the forms are complete and returned to the office, a cooperative representative will contact you to meet you at your service location and assist with your plans.

Before the service is complete you must have the following:

  • All the appropriate permits from County Zoning, Health Department, and local Township or City as required.
  • The basement must be backfilled at the meter socket location, and all final excavating and grading must be completed in the cable route.
  • A bypass meter socket must be installed and the electrical affidavit signed by the electrician. The meter socket must be inspected by the local electrical inspector, if applicable. All meter sockets shall be a minimum 200 amp sockets. *If the building will be multi-unit, each unit must be indentified on the appropriate paperwork.
  • All line extension payments must be paid in full prior to the installation of electric service.

Upon the installation of an 80 gallon electric water heater and load management control (LMC), you will be reimbursed $150 of the $500 new construction fee.  Visit our rebates page for all other rebates.

New Construction Guide - pdf

Winter Construction Policy and Guidelines:

 

 

 

 

Powered by Touchstone Energy Cooperatives Logo